R&D
We, Kum A Powertech, are always making
constant efforts to develop the best products.
Start
The problems of components are verified in advance before mass-production by manufacturing newly designed hydraulic pump and power train.
Manufacturing
Start components undergo precision processing using advanced processing equipment.
Measurement
We measure the prototype parts of hydraulic pump and power train precisely with the best devices to improve the reliability of development products.